Doors, Garage and Otherwise
Appleseed finished pouring the concrete on the first floor of the garage and started building the forms for the second floor. They also installed the garage doors. Until they get that second floor completed, the door leading to the second floor looks like it is hanging in space, which I think is a lot of fun for some reason. Work has started on the freight elevator, too. The components have arrived and scaffolding has been erected to install them.
Work on my loft continues. Interior doors have been hung. All tiling is complete. HVAC is installed. New Heart Pine boards have been installed in some of the damaged areas.